Zero RFI
We talked to more than 200 owners and developers. We asked them where it hurts.
They were candid in a way people rarely are when they are still in the middle of a relationship with their vendors. Here is what they actually said.
The thing they said first
The biggest pain is not cost overruns, though cost overruns are constant. It is not schedule delays, though those are universal.
The biggest pain is that buildings are not their core business, and yet building consumes enormous amounts of their leadership’s attention, energy, and goodwill.
A hospital system builds to serve patients. A university builds to serve students. A manufacturer builds to produce product. The building is a means to that end (an expensive, complicated, time-consuming means) and what owners want more than anything is to get through it without their real business suffering.
When the building process goes well, it is invisible. When it goes badly, it eats the organization. Every owner we spoke to had stories about projects that consumed years of management attention, burned out internal teams, and produced buildings that required immediate operational fixes.
The specific frustrations, in their words
Budgets and schedules. Accurately predicting costs and timelines was the top concern. But the frustration was not just overruns. It was the absence of early warning. Owners do not want to react to overruns. They want enough visibility to intervene before an overrun becomes a fact.
Permitting. More than half cited permitting, internal approvals as much as external ones, as a major bottleneck. Delays in permitting cascade through everything downstream. Owners who cannot get ahead of permitting timelines end up compressing construction schedules, which costs money and quality.
Communication failures. Misalignment between early-phase designers and contractors is the most expensive coordination problem in the industry. Owners described sitting through meetings where architects and engineers debated technical details that would be resolved differently by the contractor who actually builds it, and no one in the room had the contractor’s perspective.
Talent. Finding and keeping skilled specialists is getting harder and directly affecting project outcomes. The best project managers are perpetually oversubscribed. Owners who cannot attract or retain experienced internal staff are permanently disadvantaged in managing their vendors.
The star PM problem. Nearly 60 percent of owners said they were tired of relying on heroic individual project managers who save projects at the last minute. They want systems. Documented processes. Playbooks that work regardless of which exceptional individual happens to be available.
The pattern underneath the frustrations
What owners described, in aggregate, is a delivery system optimized for the people delivering, not for the people receiving.
The architect’s process is designed around design excellence. The contractor’s process is designed around risk management. The subcontractor’s process is designed around scope protection. None of those processes have “owner understands what is happening and can make informed decisions” as a primary design objective.
The owner gets what is left over. Usually that is a weekly report, a monthly budget update, and a change order when something has already gone wrong.
What the owners who had better experiences had in common
They were involved earlier. Not in an oversight capacity, in a decision-making capacity. They had people in their organizations who could read plans, ask the right questions in design meetings, and catch scope drift before it became contractual.
They had independent visibility. Not dependent on what their contractor chose to share, but access to actual project data (submittals, RFIs, schedule health) in real time.
And they held their teams accountable for operational outcomes, not just construction metrics. They asked, from the earliest design meetings, what the building would cost to operate and maintain, and they made that part of the conversation before any decisions were locked in.
The gap between those owners and the ones who described difficult project experiences was not complexity or project size. It was information. Who had it, how fast they got it, and whether they could act on it when it still mattered.
That gap is closeable. It just requires demanding something the industry has not historically been structured to provide.